From a data centre to a warm building, in six steps.
Heat can’t travel far without losing value. It has to be used close to where it’s made, which is why matching sites locally matters.
Show as a table
| From | To | MW |
|---|
The steps
Find the match
We look for data centres with heat to spare and buildings nearby that need it.
Agree the heat supply
We agree with the data centre operator how much heat is available, at what temperature and on what terms.
Sign heat buyers
We agree terms with the buildings and businesses that will use the heat.
Design and planning
We design the scheme, secure land and pipe route rights and the electricity connection, and obtain planning consent.
Secure funding
We cost the project in detail and apply for grant funding where it’s available.
Hand over
An infrastructure fund or heat network operator takes on the ready-to-build project, pays for construction and runs it long term.
Built to grow
Each project is shaped around the customers ready to sign, serving as many as the heat and the deal allow from day one. It is designed with room for more connections as the network grows.
Show as a table
| From | To |
|---|
Know a site, or a building that needs heat?
We’ll tell you quickly whether there’s a project in it.